4 skills.
Use when asked to plan or assess verification and validation (V&V) of software using IEEE 1012, including V&V activities by life cycle stage, integrity levels, and independence. Distinct from [[ieee-730-software-quality-assurance]] (overall quality assurance), [[ieee-1028-software-reviews-and-audits]] (review procedures), and [[ieee-1061-software-quality-metrics]] (measurement).
Use when asked to plan, run, or document a formal software review or audit under IEEE 1028, such as a management review, technical review, inspection, walk-through, or audit. Distinct from [[code-review-checklist]] (everyday code review), [[ieee-730-software-quality-assurance]] (SQA planning), and [[ieee-1012-software-verification-and-validation]] (V&V activities).
Use when asked to define software quality requirements and choose, collect, and validate software quality metrics using the IEEE 1061 methodology across the product life cycle. Distinct from [[software-engineering-metrics]] (general engineering measures), [[system-quality-attributes]] (non-functional requirements), and [[ieee-730-software-quality-assurance]] (SQA processes).
Use when asked to plan, set up, or assess Software Quality Assurance (SQA) processes using IEEE 730, covering SQA planning, product and process assurance, and control across the life cycle. Distinct from [[ieee-1012-software-verification-and-validation]] (technical V&V activities), [[ieee-1028-software-reviews-and-audits]] (review and audit procedures), and [[ieee-1061-software-quality-metrics]] (measurement).